Sawnly
Economy

UAE fast-tracks the pipeline that doubles Fujairah export capacity

United Arab Emirates · 15 weeks ago

On 15 May 2026, at an ADNOC executive meeting, Abu Dhabi Crown Prince Sheikh Khaled bin Mohamed bin Zayed announced the acceleration of the West-East Pipeline project to double export capacity through Fujairah, the port on the Gulf of Oman beyond the Strait of Hormuz.

The new line runs more than 360km with a 48-inch diameter and capacity of up to 1.5 million barrels per day. Added to existing infrastructure, combined pipeline capacity toward Fujairah reaches around 3.3 million b/d, and export capacity from the port could rise to as much as 4 million b/d once storage and terminal infrastructure is counted.

ADNOC's chief executive said on 20 May that the second pipeline was nearly 50% complete, with operation expected in 2027. The Habshan–Fujairah route bypasses the Strait of Hormuz, which the UAE says keeps exports running through periods of regional tension.

Source: The National and Argus Media

Related updates